This project required a full ‘gut’ of all walls, floors and ceiling and the subsequent installation of all new plumbing, electrical and ventilation.

The overall layout of the space was changed to accommodate a free-standing tub as well as a walk-in shower, going from a three-piece bath to four. This required significant changes to plumbing but the result was worth the effort. As well, a portion of the linen closet was repurposed to create useful shelving in the bathroom and the remainder is now used as a smaller closet.

Finishings such as tile, vanity and fixtures were selected by the client. As well, the client wanted to maintain the wood trim and door to be consistent with the rest of their home.

The clients are very happy with their new bathroom which was completed within the promised 1.5 week timeline.